This project started with a pipe bursting in the floor of the main bathroom. The owners decided to take the opportunity to do a complete renovation as the bathroom was more than 15 years old. This bathroom was stripped back to the concrete substructure, and all new plumbing and piping was installed. The shower structure was re-built. We installed a new shower head from the ceiling, all new tiles, new vanity, granite counter, sinks, taps, and lighting.